Druk White Lotus School – Video O&M’s

When the solar power system at the Druk White Lotus School in Ladakh was first commissioned in October 2008, a number of key operations (start-up, shut down etc.) were filmed to facilitate future operation of the system. Here is an index of the videos, hopefully it will prove useful to those now in charge of the system.

Videos (Youtube)

How to turn on the system

Data Storage operation

Switching from Grid to Generator supply

Surge Protector periodic inspection

Fault Clearance Procedure

Shutdown

General isolation use procedure

MCB Box contents – description

Cleaning procedure

Starting Generator Procedure

Clear Warning from master inverter

DC Isolation procedure

Password entry

Battery Temperature Sensor Replacement

Generator – Turning off procedure

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: